4Installing cable management brackets 安装走线架Attaching cable management brackets to theS7506E-V switch安装S7506E-V机型的走线架Installing the switch in a rack 安装交换机到机柜After placing the switch on the slide rails, do not leave go of your hands immediately because thismight tip the switch. Tipping the switch might cause switch damage and even bodily injury.将机箱放至滑道后,请确保机箱放置平稳后再松手,以免机箱倾倒而损坏设备,甚至伤害您的身体。!Installing mounting brackets 安装挂耳Grounding the switch 交换机接地 12312 211221. Place the cable management bracket against the chassisand align the screws with the screw holes in the chassis.2. Use a screwdriver to fasten the screws.1. 将走线架紧贴机箱,同时将螺钉对准机箱上对应的螺钉孔。2. 用螺丝刀沿顺时针方向拧紧螺钉,固定住走线架。Attach the cable management bracketto the left mounting bracket, which hasinstallation holes for the cablemanagement bracket.将走线架安装到带有走线架安装螺孔的左挂耳上。Attaching the cable management bracket toS7500E switch models except S7506E-V安装S7500E系列其他机型的走线架Use a minimum of two people to move the switch. For heavy models, use a mechanical lift as a bestpractice.要求多人配合(不少于2人)搬运设备,对于较重机型, 推荐您使用机械设备搬运。3To ensure the grounding effect, use theyellow-green grounding cable provided withthe switch to ground the switch.为了保证良好的接地效果,请使用随机附带的接地线(黄绿双色保护接地电缆)。Connect the grounding cable to the groundingsystem in the equipment room. Do notconnect it to a fire main or lightning rod.消防水管和建筑物的避雷针接地都不是正确的接地位置,交换机的接地线应该连接到机房的工程接地。Do not try to move the chassis by holding an FRU handle, air vents of chassis, or the handle on therear. Any attempt to carry the switch with these parts might cause equipment damage or even bodilyinjury.请勿试图通过抓握设备模块(风扇框、电源)把手、机箱通风孔或机箱后面板拉手来进行设备的搬运,否则可能因该部件无法承重而引起设备损坏,甚至会伤害到您的身体。!12 2 2 22 2 2 21!Installing FRUs 安装模块Before installing a card in thechassis, make sure the connectorson the card are not broken orblocked.安装前,请检查单板的连接器是否有破损和堵塞,以免对机箱背板造成损坏。!Installing cards 安装单板 2134