48 03-7182-01.fmOperation3 Operation3.1 InstructionInstruction is required before the first start-up. The first-time instruction of themachine must be provided only by a specialist of your authorised Hako dealer.This person will be notified immediately after delivery of the machine from thefactory and will contact you to make an instruction appointment.3.2 Before putting into service3.3 Check list: Before machine start-upAttention• Before initially starting up the machine, charge the used batteriesfully and appropriately with commissioning charge. Pleaseobserve the instruction manual of the charging device and theinstruction manual of the battery manufacturer. Hako assumes noliability for battery damage resulting from insufficient commis-sioning charge.• Check the machine for operating safety before every start-up!Eliminate faults immediately.• Before starting work, the operator must familiarize himself with allequipment, operating and actuating elements as well as with theirfunction.Description1 Checking the parking area for signs of leaks. Cables and tanks must notshow any sign of leaks or damage.2 Mounting the brushes and squeegee, see chapter Maintenance.3 Adjusting the driver's seat, if necessary, see section 3.3.1.4 Adjusting the side mirror (optional), see section 3.3.2.5 Checking the battery charge and recharge it as required, see section 5.2.2.6 Emptying the waste water tank and clean it as required, see section 5.4.7 Filling the solution tank (see chapter Maintenance) and add detergentaccording to the manufacturer's specifications.