1. If the supply cord is damaged, it must be replaced by the manufacturer or itsservice agent or a similar qualified person. The type of connecting wire isH05RN-F or H07RN-F.2. If the fuse on PC board is broken please change it with the type ofT. 3.15A/250V.3. The wiring method should be in line with the local wiring standard.4. After installation, the power plug should be easily reached.5. A breaker should be incorporated into fixed wiring. The breaker should beall-pole switch and the distance between its two contacts should be not lessthan 3mm.Outdoor unitInstall according to Drawing for the installation of indoor and outdoor unitsTo bend a pipe, give the roundness as large as possible not to crush the pipe ,●and the bending radius should be 30 to 40 mm or longer.Connecting the pipe of gas side first makes working easier.●The connection pipe is specialized for R410A.●Installation of Outdoor UnitHalf union Flare nutTorque wrenchBe careful that matters, such as wastes of sands, etc. shall not enter the pipe.The standard pipe length is 5m. If it is over 10m, the function of the unit will beaffected. If the pipe has to be lengthened, the refrigerant should be charged,according to 20 g/m. But the charge of refrigerant must be conducted by profes-sional air conditioner engineer. Before adding additional refrigerant, perform airpurging from the refrigerant pipes and indoor unit using a vacuum pump,thenSpannerForced fastening without careful centering maydamage the threads and cause a leakage of gas.Pipe Diameter(ǿ) Fastening torqueLiquid side6.35mm(1/4") 18N.mLiquid/Gas side9.52mm(3/8") 42 N.mGas side 12.7mm(1/2") 55N.mGas side 15.88mm(5/8") 60 N.m1Connection of pipes2charge additional refrigerant.Indoor unit AOutdoor unit A4G0.75mm232{POWER1 )(N )(L )(C 321 )(N )(L )(CHUM18HA03/R2(DB)HUM18HB03/R2(DB)Power cable: 3G2.5mm2Outdoor unitIndoor unitABOutdoor unitIndoor unitABABOutdoor unitIndoor unitOil trapCAUTIONMax.Elevation: Amax=15m●In case the elevation A is more●than 5m, oil trap shoud beinstalled every 5~7mMax. Length: Bmax=25m●In case the pipe length B is●more than 10m, the refrigerantshould be charged, accordingto 20 g/m.3Use the same method on indoor unit. Loosen the screws on● terminal block andinsert the plugs fully into terminal block, then tighten the screws.Insert the cable according to terminal number in the same manner as the indoorunit.●If wiring is not correct, proper operation can not be carried out and controllermay be damaged.●Fix the cable with a clamp.●Connection3If the drain-elbow is used,● please attach it as figure. (Note:Only for heat pump unit.)Detach the service port’s cap of1. 3-way valve, the valve rod’s cap for 2-way valveand 3-way’s, connect the service port into the projection of charge hose (Iow)for gaugemanifold. Then connect the projection of charge hose (center) for gau-gemanifold into vacuum pump.Open the handle at Iow in2. gaugemanifold, operate vacuum pump. If the scale-moves of gause (Iow) reach vacuum condition in a moment, check 1. again.Vacuumize for over 15min.And check the level gauge which should read -0.1MPa3. (76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close thehandle ‘Lo’ in gaugemanifold and stop the operation of the vacuum pump. Checkcondition of the scale and hold it for 1-2min. If the scale-moves back in spite oftightening, make flaring work again, the return to the beginning of 3 .Attaching Drain-Elbow4Purging Method:To use vacuum pump5Open the valve rod for the 2-way valve to an angle of4. anticlockwise 90 degrees.After 6 seconds, close the 2-way valve and make the inspection of gas leakage.HUM18HC03/R2(DB)