Haier air conditioner Edition: 20070924Installation of air-conditioner1. Make the wall hole or window hole (see Fig.5).2. Fix the prefabricated iron frame to stableposition by expansible screws.3.Take out the conditioner and accessoriesfrom the package .4.5. If you need to lead the condensed water toindicated position, please purchase a pieceof plastic pipe , set it on the outlet pipe fittingand tie it tightly.6. After installation of all the accessories, putthe whole machine on the iron frame. Ifthere's water outlet flexible pipe, lead thepipe to needed position(see Fig.7).7. Fill any distance between the wall hole andthe machine body with flexible sponge rubberstrip to prevent the entering of outer noise andthe leaking of the coolness.Cooling-only type air-conditioner: before dispatchedfrom the factory, the drip hole at the bottom platehas been blocked by rubber lid in the accessories.If the surrounding humidity is high, should assembledrainage bend in the drainage hole at the back ofbottom plate and connect the drainage tube asillustrated in Fig. 6. If the user doesn't need toretain the condensate in the bottom plate, canremove the rubber lid on the bottom and asillustrated in Fig. 5, assemble the attached drainpan on the bottom of the air-conditioner, and connectdrainage tube at the water outlet hole on the drainpan.8. After installation of the conditioner, insert thepower plug into the outlet and perform test-run.Fig. 5Drain pan ScrewRubber lidCondenserFig.6Outlet pipe fittingCondenserWater outlet flexiblepipe(provide by user)Fig.7WallWater outlet flexiblepipe(provide by user)- 16 -