IBM FlashSystem 7200 ControlEnclosure Getting Started Guide IBMGetting startedThis document describes the installation procedures for your IBM® control enclosure. It also contains information to help you plan thesystem configuration. This document is intended to be used by persons who are experienced with installing these systems.System MTMsIBM FlashSystem® 7200 control enclosure 2076-824 and 2076-U7CBefore you use this information and the product it supports, read the following topics:• Installation worksheets on page 10• Safety and environmental notices on page 14• Notices on page 15• IBM Environmental Notices and User Guide and IBM Safety Notices (provided on a DVD with your product order)IBM Knowledge Center (https://ibm.biz/BdqxdY) contains more information about preparing the physical environment before theinstallation; it also provides information about configuring, managing, and servicing the system after installation. The IBM KnowledgeCenter is updated between product releases to provide the most current documentation.Unpacking and verifying the contentsBefore you start the installation process, ensure that the following items are available.• Philips screw driver• Box knife• Flat-blade screw driver (optional)• Three Ethernet cablesThe control enclosure and the following related parts are included in one box. The enclosed inventory sheet lists the part numbers of theitems that were ordered. Items, such as drives and networking adapters, are preinstalled inside each node canister.• Control enclosure with the following components preinstalled:– Two node canisters with optional networking adapters, SFPs, and memoryEach node canister contains three networking adapter slots. The same number and type of adapters must be installed in each nodecanister. The control enclosure can contain 0, 2, 4, or 6 networking adapters.– Two power supply units (PSUs)– A combination of 24 drives and drive blanksThe number of drives and drive blanks varies, according to the number of drives that were specified in the product order. Forexample, if 12 drives were ordered, the drives and 12 drive blanks are preinstalled in the control enclosure.• Rail kit, which includes the left and right rails, and 8 securing M5 screws and locating pins.• Cables, if they were ordered, for the type and number of networking adapters that are installed in each node canister.• Two power cables.