IBM TS2290 Manual
Also see for TS22 Series: Manual
Removing components from the upper positions in the rack cabinet improves rack stability during relocation. Follow these general guidelines whenever you relocate apopulated rack cabinet within a room or building:Reduce the weight of the rack cabinet by removing equipment, starting at the top of the rack cabinet. When possible, restore the rack cabinet to the configuration ofthe rack cabinet as you received it. If this configuration is not known, you must do the following:Remove all devices in the 32U position (compliance ID RACK-001) or 22U (compliance ID RR001) and above.Ensure that the heaviest devices are installed in the bottom of the rack cabinet.Ensure that there are little-to-no empty U-levels between devices installed in the rack-cabinet below the 32U (compliance ID RACK-001) or 22U (complianceID RR001) level, unless the received configuration specifically allowed it.If the rack cabinet you are relocating is part of a suite of rack cabinets, detach the rack cabinet from the suite.If the rack cabinet you are relocating was supplied with removable outriggers, they must be reinstalled before the cabinet is relocated.Inspect the route that you plan to take to eliminate potential hazards.Verify that the route that you choose can support the weight of the loaded rack cabinet. Refer to the documentation that comes with your rack cabinet for theweight of a loaded rack cabinet.Verify that all door openings are at least 760 x 2032 mm (30 x 80 in.).Ensure that all devices, shelves, drawers, doors, and cables are secure.Ensure that the four leveling pads are raised to their highest position.Ensure that no stabilizer bracket is installed on the rack cabinet during movement.Do not use a ramp that is inclined at more than 10 degrees.When the rack cabinet is in the new location, complete these steps.Lower the four leveling pads.Install stabilizer brackets on the rack cabinet or in an earthquake environment bolt the rack to the floor.If you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowest position to the highest position.If a long-distance relocation is required, restore the rack cabinet to the configuration of the rack cabinet as you received it. Pack the rack cabinet in the originalpackaging material, or equivalent. Also, lower the leveling pads to raise the casters off the pallet and bolt the rack cabinet to the pallet. (R002)DANGERRacks with a total weight of > 227 kg (500 lb.), Use Only Professional Movers! (R003)CautionRack is not intended to serve as an enclosure and does not provide any degrees of protection required of enclosures.It is intended that equipment installed within this rack will have its own enclosure. (R005)Tighten the stabilizer brackets until they are flush against the rack. (R006)Use safe practices when lifting. (R007)Do not place any object on top of a rack-mounted device unless that rack-mounted device is intended for use as a shelf. (R008)If the rack is designed to be coupled to another rack only the same model rack should be coupled together with another same model rack. (R009)DangerMain Protective Earth (Ground): This symbol is marked on the frame of the rack. The PROTECTIVE EARTHING CONDUCTORS must be terminated at that point. Arecognized or certified closed loop connector (ring terminal) must be used and secured to the frame with a lock washer using a boltor stud. The connector must beproperly sized to be suitable for the bolt or stud, the locking washer, the rating for the conducting wire used, and the considered rating of the breaker. The intent is toensure the frame is electrically bonded to the PROTECTIVE EARTHING CONDUCTORS. The hole that the bolt or stud goes into where the terminal connector and the lockwasher contact must be free of any non-conductive material to allow for metal to metal contact. All PROTECTIVE BONDING CONDUCTORS must terminate at this mainprotective earthing terminal or at points marked with . (R010)Always ensure that a load of 95 kg (210 lb) is inside the bottom of the rack (compliance ID RR001), especially before relocating or servicing units with their Center ofGravity (CoG) higher than 22U. (R011)Verify kit contentsEdit onlineBefore you begin, verify that your kit is complete.Qty Description1 Fixed shelf4 Screws54 IBM TS22xx - TS2290, TS2280, and TS2270 |
Related manuals for IBM TS22 Series
IBM TS22 Series Manual
IBM ThinkPad 73P3297 User Manual
IBM ThinkPad 73P3315 User Manual
IBM ThinkPad 73P3279 User Manual
IBM ThinkPad 22P7028 User Manual
IBM Power System 9040-MR9 Manual
IBM L5X Installation And User Manual
IBM OPTIONS Zip 100MB IDE User Manual
IBM T200 Ultrium Setup, Operator, And Service Manual
IBM 9348 Service Information
This manual is suitable for:
manualsdatabase
Your AI-powered manual search engine