ICP OLB5-R059-085-3 Installation Instructions And Owner's Manual
Also see for NOLF105A12B: Installation instructions and owner's manualInstallation instructions and homeowner's manual
Contents |
6. Pull the insulation back to expose the corrugated stainless steelcore.7. Cut the corrugated stainless steel core back by 3" for the IFVSeries vent. You should now have about 3" of insulation hangingout past the stainless steel core (see figure #1.4).8, Push the stainless steel core onto the breech pipe as far as it willgo (see figure #1.5) and mechanically attach the vent to thebreech using three of the #8 X 1/2" self-drilling screws providedwith the VTK Series kit. The screws should be equally spacedaround the circumference of the stainless steel core, starting withthe first screw at top dead center. Start the drill point of thescrews in the valleys of the corrugations at 3/8"-5/8" back fromthe end of the stainless steel core, so the screw heads can beproperly sealed in the forthcoming operations (see figure #1.6).9, With the stainless steel core now firmly attached to the breech,tear off one green gum-sealing strip from the backing strip. Wrapthe seal strip around the joint, always keeping the centerline ofthe seal strip over the line where the corrugated stainless steelcore makes the transition to the smooth outer surface of thebreech pipe. In other words, the seal strip must be centered overthe joint. After wrapping the seal strip around once, allow 1/2"overlap and tear offthe residual length (see figure #1.7).10. Break the residual length of seal strip in to 3 equal parts and stuffthem onto the screw heads of the stainless steel self-drillingscrews so that the screw heads are completely covered.11. Two stainless steel band clamps are provided in the VTK Serieskits. Position one stainless steel band clamp over the gum sealjoint so that the edge of the clamp closest to the breech lines upwith the edge of the gum seal that is closest to the breech.Ensure that the band will close with an action of one strip slidingover the other - not under the gearhead of the draw clamp (seefigure #1.8). Tighten the band clamp with considerable torquetocause the gum sea! be squeezed into all crevices and to oozeout of the end of the clamp closest to the breech (see figure#1.9). The gum will eventually become rubbery.12. The seal is permanent and should never need to bedisconnected as the breech plate can be removed for cleaningand inspection using the 4-bolt joint.13. Tuck the vent insulation into the breech collar.14. Screw the spin sleeve tightly into the breech cellar for a finishedappearance. Wrap the other end of the spin sleeve withaluminium tape to cover any metal burrs that may be present(see figure #1.10).15. Bend the venting into the desired radius coming offthe breech.Connection to the vent terminal - DV-2000TM:Prepare the terminal end of the insulated flex vent by firstscrewing the spin sleeve onto the corrugated aluminium jacketuntil the trailing edge of the spin sleeve is about 19" from the endof the vent.2. Using sharp tin snips, cut the aluminium outer sleeve back by 5"for the IFV Series vent3. Pull the insulation back to expose the corrugated stainless steelcore.4. Cat the corrugated stainless steel core back by 3" for the IFVSeries vent. You should now have about 3" of insulation hangingout past the stainless steel core.5, Push the stainless steel core onto the pipe on the back of theterminal as far as it will go and mechanically attach the vent tothe terminal using three of the #8 X 1/2" self-drilling screwsprovided with the VTK Series kit. The screws should be equallyspaced around the circumference of the stainless steel core,starting with the first screw at top dead center. Start the drill pointof the screws in the valleys of the corrugations at 3/8"-5/8"backfrom the end of the stainless steel core.8, With the stainless steel core now firmly attached to the terminal,tear off the other green gut_sealing strip from the backing strip.Wrap the sea! strip around the joint, always keeping thecenterline of the seal strip over the line where the corrugatedstainless steel core makes the transition to the smooth outersurface of the terminal pipe. After wrapping the seal strip aroundonce, allow 1/2" overlap and tear off the residual length.7. Break the residual length of seal strip in to 3 equal parts and stuffthem onto the screw heads of the stainless steel self-drillingscrew s so that the screw heads are completely covered.8. Position the other stainless steel band clamp over the gum sealjoint so that the edge of the clamp closest to the terminal lines upwith the edge of the gum sea! that is closest to the terminal.Tighten the band clamp with considerable torque to cause thegum seal be squeezed into all crevices and to ooze out of theend of the clamp closest to the terminal (see figure #1.11 ).9. The seal is permanent and should never need to bedisconnected as the end of the terminal can be opened forcleaning and inspection by removing the screened end-coneassembly. Tuck the vent insulation into the recess in the terminalbody.10. Screw the spin sleeve tightly into the recess for a finishedappearance. Wrap the other end of he spin sleeve withaluminium tape to cover any metal burrs that may be present(see figure #1.12).1I. Bend the venting into the desired radius coming off the terminal.Installing terminal in the wail - DV'2000TM:1. Cut a 6" hole in the side-wall in accordance with the locationconsiderations outlined in the previous section.2. Fasten the wall plate to the inside-wall using 4 field-providedfasteners appropriate for the material behind the wall plate.Depending on the angle of access, the pressure control bracketmay need to be removed to access the top right wall plate screwhole. For concrete and block, Tapcon TM screws or equivalent arerecommended. Install the wall plate so that the top of the hole inthe wall plate is positioned 1/8" lower than the top of the 6" holein the wall. This will accommodate the proper downward slope ofthe terminal, in the direction from the inside to the outside.3. Remove the 2 screws fastening the end cone in place andremove the cone.4. Remove the 2 screws fastening the stabiliser shroud in place andremove the stabiliser shroud.5. Insert the main body of the terminal through the wall plate so thatthe end of the terminal extends about 2" past the outside wall.6. Install the stabiliser shroud and replace the two mounting screws.(see figure #1.13).7, For concrete and block wall installations in particular, If it appearsthat the flange on the back of the stabiliser shroud is not largeenough to cover the irregularities in the hole, a field fabricatedwall plate can be constructed out of 304,316, or 316L stainlesssteel.8. Silicone seal the circumference of the joint where the stabilisershroud connects to the main body of the terminal.9. Apply caulking to the back plate of the stabiliser shroud and pushthe terminal back firmly against the wall, making sure thepressure switch is located at the top, in a horizontal position.11 |
Related manuals for ICP NOLF105A12B
ICP OLR105A12B Installation Instructions And Owner's Manual
ICP AMP105-1E2 Installation Instructions And Owner's Manual
ICP AMT098SDMA Installation Instructions And Owner's Manual
ICP NOMF105D12A Installation Instructions And Owner's Manual
ICP OLR Series Installation Instructions And Homeowner's Manual
ICP OMF112K14A Installation Instructions And Homeowner's Manual
ICP OMF112K14A Installation Instructions And Homeowner's Manual
ICP AMP105-IE2 Installation Instructions And Homeowner's Manual
ICP A Series Installation Instructions Manual
ICP SUPREME FEM Series Installation Instructions And Homeowner's Manual
manualsdatabase
Your AI-powered manual search engine