|
Nozzles:The burners are provided with the highest capacityUSGPH nozzle installed. If another size nozzle, orreplacement nozzle is required, use the nozzle sprayangle, type and manufacturer recommended in Table#4.1 to 4.3. Note that all nozzle-marked sizes arebased on a pump pressure of 100 psi.Always select nozzle sizes by working back from theactual desired flow rate at operating pressure, and notby the nozzle marking.Air and turbulator settings:Before starting the burner for the first time, adjust the airand turbulator settings to those listed in the Table #4.1to #4.3. Once the burner becomes operational, finaladjustment will be necessary.Fuel supply system:Fuel SpecificationsI NOTE: Use No.1 or No.2 Heating Oil (ASTM D396) orin Canada, use No.1 or No.2 Furnace Oil.Before starting the burner be sure the fuel tank isadequately filled with clean oil.Fire and explosion hazard.Use only approved heating type oil in thisfurnace. DO NOT USE waste oil, usedmotor oil, gasoline or kerosene.Use of these will result in death, personalinjury and/or property damage.IMPORTANTWhen using nozzle sizes of less than .75USGPH, the Installation Code for oil burningequipment requires the installation of a 10micron (or less) filter in the fuel oil line. ICPrequires that this practice be followed in orderto keep the lifetime heat exchanger warrantyintact.NOTE: You may notice a slight odor the first time yourfurnace is operated. This will soon disappear. It is onlythe oil used on the parts during manufacturing.8) INSTALLING ACCESSORIESElectrical shock hazard.Turn OFF electric power at fuse box orservice panel before making any electricalconnections and ensure a proper groundconnection is made before connecting linevoltage.Failure to do so could result in propertydamage, bodily injury or death.8.1) Electronic air cleaner:Wire leads are provided to direct 115 volts @ 0.5 Ampmaximum to an electronic air cleaner (EAC). Power willbe available to the EAC at all times, so it mustincorporate a flow proving switch if it is to be wired intothe furnace control box. Most modern EACs have therequired integral airflow-proving switch. Wire theelectronic air cleaner as indicated in figure #6.8.2) Humidifier:Terminals are provided to direct 115 volts @ 1.0 Ampmaximum to the transformer powering the humidifier.The humidifier will be energised anytime the blower isoperating on the "Heating Speed". Wire the 115-voltpower as indicated in figure #6.8.3) Air conditioning:An air conditioning coil may be installed on theairside only. Also, notwithstanding the evaporator coilmanufacturer's instructions, a minimum of 6 inchesclearance must be allowed between the bottom of thecoil drain pan, and the top of the heat exchanger. Wirethe thermostat and condensing unit contactor asindicated in figure #6.17 PreviousNext |