PCISA-9652 Half-Size CPU CardPage 76o When working with the PCISA-9652, make sure that it is disconnectedfrom all power supplies and that no electricity is being fed into the system.Before and during the installation of the PCISA-9652 DO NOT: Remove any of the stickers on the PCB board. These stickers are required forwarranty validation. Use the product before verifying all the cables and power connectors areproperly connected. Allow screws to come in contact with the PCB circuit, connector pins, or itscomponents.5.2.2 Installation ChecklistThe following checklist is provided to ensure the PCISA-9652 is properly installed. All the items in the packing list are present The CPU is installed The CPU cooling kit is properly installed A compatible memory module is properly inserted into the slot The jumpers have been properly configured The PCISA-9652 is inserted into a chassis with adequate ventilation The correct power supply is being used The following devices are properly connectedo IDE deviceo SATA driveso Power supplyo USB cableo Parallel port cableo Serial port cable The following external peripheral devices are properly connected to thechassis:o VGA screeno RJ-45 Ethernet cableo USB devices