16 Minimiser SE - InstallationINSTALLATIONNote. The template shows the positions for the fixing holes andthe flue hole centres for standard installation.Care must be taken to ensure the correct holes are drilled.1. Separate the templates and discard template B.2. Tape template into the selected position.3. Ensure squareness by hanging a plumbline as shown.4. Mark onto the wall the following:a The plate screw positions (choose one from eachgroup) and lower fixing screw position.b. The position of the flue duct hole.Note. Mark the centre of the hole as well as thecircumference5. Remove the template from the wall.16 WALL MOUNTING TEMPLATE15 FLUE ASSEMBLY - Exploded View17 PREPARING THE WALLIMPORTANT. Ensure that, during the cutting operation,masonry falling outside of the building does not causedamage or personal injury.1. Cut the flue hole (preferably with a 5" core boring tool),ensuring that the hole is square to the wall.Both wall faces immediately around the cut hole shouldbe flat.2. Drill 3 holes with a 7mm ( 1/4 ") masonry drill and insert theplastic plugs provided, for the wall mounting plate and thejacking screw plate.3. Locate two No.10 x 2" screws in the wall mounting plate(one at each side, in any of the 3 holes provided at eachside) and screw home.Note. If theterminal is tobe sited within25-40mm of acorner orvertical pipe(refer to Table3) then the holeMUST beaccurately cutand the rubberweather sealtrimmedaround thegrooveprovided.The terminalwall plate neednot be fitted.REAR FLUE OUTLETLEGEND1. Terminal.2. Weather seal.3. Duct assembly.4. No. 8 x 8 self tapping screw.5. Flue Turret.6. M5 x 10 pozi screw.7. Turret clamp.8. Turret seal.1. An optional flue duct extension kit is requiredfor wall thicknesses greater than 580mm(22 3/4 "). Refer to Frame 14.2. When cutting the ducts always use thecardboard support cutting aid provided.