33Response 80 / 100 / 120 - Installation47 SERVICING SCHEDULEmust be divided by 10,000 to convert it to a percentage.If the ratio of CO/CO 2 is less than 0.004 and the gasrates measured in steps 3 and 4 are close to nominalthen no further action need be taken. If not, proceed tostep 5.5. Clean the main burner.6. Clean the heat exchanger.7. Check the main injector for blockage or damage.8. Check that the flue terminal is unobstructed.The servicing procedures are covered more fully in Frames48 to 53 and MUST be carried out in sequence.WARNING.ALWAYS turn off the gas supply at the gas service cock, andswitch off and disconnect the electricity supply to theappliance before servicing.Switching the boiler on/off switch 'off' when a frost thermostatis wired directly from the mains may leave a live feed to theboiler.ALWAYS test for gas soundness and carry out functionalchecks on reassembly.IMPORTANT. When work is complete the boiler inner frontsealing panel MUST be correctly refitted, making a goodseal.DO NOT OPERATE THE BOILER IF THE SEALINGPANEL IS NOT FITTED.48 BOILER SEALING PANEL REMOVAL3. Remove the screws and pull out the tabs from the slots.1. Turn off the gas supply at the gas service cock anddisconnect the electricity supply.2. Remove the screw and lift off the boiler front panel.SERVICINGSERVICINGTo ensure the continued safe and efficient operation of theappliance it is recommended that it is checked at regularintervals and serviced as necessary. The frequency ofservicing will depend upon the installation condition and usagebut should be carried out at least annually. It is the law thatany service work must be carried out by a registered CORGIinstaller.1. Turn the heating controls to maximum so that the boilerlights and remains running. Check that no other gasappliances in the house are in use or likely to be used.2. When the boiler has settled down check the gas rate atthe meter (if the meter is of the pointer type you shouldtime only complete revolutions of the pointer). Check thegas rate against the figures given in Table 1 for CHoperation.3. Fully open a hot water tap. The pump should stop as theboiler switches to HW mode. When the boiler has settleddown check the gas rate, as in step 3, checking themeasured rate against the figures given in Table 1 for HWoperation.4. Check the percentages of CO and CO 2 in the flue gases atthe sampling point provided. Refer to Frame 48.Note.If your meter reads CO in parts per million the figure