Tool changeItem no. 10301084, Revision 0830 ( 40 )10.3 Tool changing station (optional accessory)Example of design: Ejection travelDuring a tool change, the HF spindle moves into the changing station withthe clamped tool.Ü Note the following values when producing the changing station in orderto compensate for the ejection travel (X):Spring loaded X = 2 - 5 mmSpring force 40 - 80 N10.3.1 pneumatic direct changeThe HF spindle enters the changing station as far as the stop ring. Only thendoes the cylinder push the collet out of the shaft.Ü The collet opens.Ü Only the tool is deposited in the changing station.Tip: Fast tool change.u Use a tool with a stop ring.This means that there is no need to re-adjust the immersion depth after eachtool change.10.3.2 Installing the changing stationProceed as follows to install the changing station:Ü Drill a hole with a suitable diameter (Ø D1 H7) for the tool mount.Ü Add an M5 thread.Ü Insert the changing station into the hole.Ü Secure the changing station using the threaded spindle (M5).10.3.3 MaintenanceBefore commencing work:Ü Check that all surfaces are thoroughly cleaned and free of dust, grease,coolant, machining residues, and metal particles.Ü Check that the changing station is free of damage.