91-2. Ensure the base and wall are leveled. Place 2 metal tracks (B) approximately 25mm (1in) from the edge ofthe wall panels to the center of the holes of the metal track.3-4. Mark the holes clearly on the wall.5. Remove tracks and drill pilot holes in the marked locations with a Φ3mm (1/8in) drill bit.6-7. Replace and secure the metal tracks (B) with screw (DD), fitting (GG) and cap (HH). Do not overtighten.WALL TRACKS INSTALLATION325mmDDGG2B1425mmΦ 3mm1/8inB5 6 7HHGGDDHHHelpful HintDo not overtighten!This may crack thewall panels.Helpful HintMake sure thereis a support studlocated behind thedrywall, behind thetracks!