EnglishStella™ Siena™ & Celeste™ Freestanding Baths1 Install the metal drain/waste fitting (supplied with the tub) into the drain hole as illustrated (Figure 1). Ensure that the drainopening on the waste fitting is situated in the integral overflow channel (Figure 1).CAUTION! The integral overflow cover is not removable. The warranty will be voided if attempted.Use clear silicone to adhere the bottom gasket to the underside of the integral overflow channel (Figure 1).Secure the waste fitting with the supplied waste fitting nut. Apply thread sealant to the threads prior to inserting the nut.Overtightening the nut may cause shell damage. Ensure the drain opening on the waste fitting is not exposed after tighteningof the nut.Install a PVC thread adaptor (not supplied) to the metal waste fitting. This is to provide a PVC to PVC connection to the stubup in the floor. Water test fitting for leaks before installation. NOTE: Use PVC Cement per ASTM D 2564 on all PVC joints.Carefully lift the tub and apply a bead of clear silicone or construction adhesive to the bottom edge of the tub (Figure 1).CAUTION! Before applying construction adhesive, please make sure that the permanent location of the bathtub hasbeen determined.Carefully lower tub over the drain stub up in the floor. Thread the metal toe-tap drain cover (supplied) into the waste fitting.Wipe off excess silicone or construction adhesive with a clean cloth.Page 4 Installation and OperationInspection and TestingVisual InspectionBathtub Water and Operational TestAll bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit must beretested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have been discovered,repaired, or avoided by following this inspection and testing procedure:1 Place the bathtub on a level surface, near appropriate water supply, and water drainage. A driveway is a suitable choice.2 Cover the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole.3 Allow bathtub to stand for 5 minutes.4 Visually inspect for leaks. Do not install the bathtub if leaks are detected.5 Return bathtub to packaging or otherwise protect from damage until time of installation.1 Remove the bathtub from the shipping packaging. Be careful not to scratch the surface of the bathtub with exposed staples,screws, or nails. Retain the packaging until satisfactory inspection of the product has been made.2 Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage toany components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excludedfrom the warranty. Jacuzzi Luxury Bath responsibility for shipping damage ceases upon delivery of the products in good orderto the carrier.3 Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the publishedwarranty information packaged with the product or in the back of this manual. Please note: blemishes, air holes, or castingmarks on the underside of the bath are not considered defects and do not affect performance or quality of bath.READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THEWARRANTY.• Make sure that walls and floors meet fire safety requirements of local building code and/or FHA/HUD Minimum PropertyStandards.• Observe all governing codes and ordinances.• Proper installation is your responsibility. Have a qualified technician install this bathtub.• Ensure location is structurally sound, flat and level. A Technical Specification has been included with your bathtub. The TechnicalSpecification will contain pertinent information regarding your product. Locate the Technical Specification at this time.Framing and SupportIMPORTANTInstallation Instructions for Tubs with Integral Overflow56234