Espree™ Bathtub SeriesPage 10 www.jacuzzi.com Installation and OperationEnglishInspection and Testingvisual InspectionAll bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unitmust be retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that couldhave been discovered, repaired, or avoided by following this inspection and testing procedure:XX Place the bathtub on a level surface, near appropriate electrical supply, water supply, and water drainage. Adriveway is a suitable choice.XY Seal the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole.XZ Allow bathtub to stand for 5 minutes.X[ Plug in motor/pump and turn unit on. Confirm that all features function as described in the Operation section ofthis manual. Do not install the bathtub if bathtub fails to operate as described.X\ Visually inspect all joints for leaks. Do not install the bathtub if leaks are detected.X] Return bathtub to box or otherwise protect from damage until time of installation.XX Remove the bathtub from the shipping carton. Be careful not to scratch the surface of the bathtub on exposedstaples. Remove the staples or fold them into the carton. Retain the carton until satisfactory inspection of theproduct has been made. Do not lift the bathtub by the plumbing at any time; handle by the shell only.XY Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visibledamage to any components, do not install the bathtub. Damage or defect to the finish claimed after the bathtubis installed is excluded from the warranty. Jacuzzi Luxury Bath’s responsibility for shipping damage ceases upondelivery of the products in good order to the carrier.XZ Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to thepublished warranty information packed with the product or in the back of this manual.Bathtub Water and Operational Test