- 21 - GAB/GAS-SH-e-0711Chapter 4 Maintenance4.1 Disassembly Procedure (Small Size: 3kg • 6kg)The seal restricts the peel according to the country by a no report and doing as wantingput it. Follow the relevant procedure for the respective countries.4.1.1 Base ReplacementDisassembly procedure1. Remove dry batteries when using batteries. Remove the AC adaptor when using the ACadaptor.2. Remove four foot levels.3. Peel off the approval seal.4. Remove the four M4×10 screws.5. Lift the base, and pull out the battery harness from CN2 of main board PS-005.Assembly procedure1. Perform in reverse order to disassembly.2. The approval seal material is a void seal. It is not possible to use it again. Use a new approvalseal.KERN