Pro 3200 Evolution, Pro 4200 Evolution, Pro 5200 Evolution/0109 – 7© COPYRIGHT KEMPPI OYmax. 1506002. INSTALLATION2.1. SITING THE MACHINESite the machine on a stationary, horizontal, dry base in a position that does NOTallow dust, dirt or metal particles to enter the machines cooling air flow.- Preferably site the machine somewhat higher above thefloor level.- Ensure that the front as well as the rear of the machinethere is at least 20 cm free distance to allow goodcirculation of the cooling air through the machine.- Protect the machine against heavy rain and in hotcircumstances against direct sunshine. Ensure the freecirculation of the cooling air.Degree of protection of machine IP23allows at its maximum the water spray comingin 60º angle to hit machine’s outer covering.2.2. MOUNTING THE CONTROL PANELS PL AND PXMounting of panel should only be carried out by competent electrician.Attention! Disconnect plug of machine from mains socket and wait for approx. 2 minbefore removing cover plate.- On the front face of machine there is a cover plate where the control panel is mounted.Without a panel the machine is controlled either from remote control unit or Promigor Protig unit.- Mount PL or PX panel according to mounting instructions delivered with them.2.2.1. Connection to the mains supplyPro power sources are delivered equipped with 5 m mains cable without plug.If local electricity regulations of operating country are stating otherwise, the mains cable should bereplaced in conformity with the local regulations.Connection of the mains cable, mounting and change of the plug should only be carried out by acompetent electrician.Remove the machine’s right side plate to enable the mounting of a mains cable.See to that the machine is positioned away from the line ofparticle spray, created by grinding tools etc.rain water