10Exact power supply requirements for LSMV4-V5-V8Motor Size 1.5kW1. 220V 1 phase and earth, 16amp supply (earth, neutral & live).2. Supply should be protected by 16amp fuse (i.e. motor rated 16amps) or by a 16amptype D circuit breaker.3. The isolator/ plug should be positioned ideally within 2m of the machine.4. If outdoors, the isolator/plug should be waterproof to IP56 and we recommend itincorporates a 30mA RCD.Customer responsibilitiesWhen installing, operating and maintaining your baler the customer is responsible for: Ensuring that the power requirements for the machine are satisfactory and thatinstallation of the plug and socket are carried out in accordance with the country ofuses electrical standards. Ensuring that ALL personnel using the baler have read the operators manual andunderstood all of the safety and operational procedures. Ensuring that personnel have access to the operator’s manual at all times. Ensuring that the electrical cable from the machine to the mains is located in a safeposition out of harm’s way and does not pose any hazards to the operator. Ensuring that the baler is plugged directly to the mains supply without the use of anextension cable. Supplying M12x50 rawl or other suitable fixings to fix machine to the ground orwall. Supplying a lock for the top door to prevent unauthorised use.End of life informationYour baler is primarily constructed from recyclable materials. When the machine hasreached end of life the below guidelines should be followed for safe and environmentallyfriendly disposal. Drain hydraulic oil. Collect in a container and bring to your local recycling centre fordisposal Disassemble machine and sort into its separate materials. Steel components can be sold to a scrap steel merchant. All copper wire/electrical components/rubber/nylon should be brought to your localrecycling centre for disposal.