Tools Required• Safety glasses• protective padding• 3/16” hex key• ladder• proper personnel for lifting panels (75lbs)• glass handling equipment, to lift 150lbsInstallation GuideConnect 2.0 Shelter, 8ft solar unit, glass roof assemblywww.landscapeforms.com Ph: 800.521.2546Date: March 4, 2019Page 1 of 4ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish. To protect this finishduring assembly, place unwrapped powdercoated parts on packaging foam or other non‐marring surface. Donot place or slide powdercoated parts on concrete or other hard or textured surface – this will damage thefinish causing rust to occur. Use touch‐up paint on any gouges in the finish caused by assembly tools.1. Anchor kit installation2. Frame assembly3. Roof assembly4. Wall glass assembly5. Wiring connectionsOrder of operations: 5/16‐18 x 2” BHCS‐ 15X5/16 WASHER‐ 15XROOF PANEL TOPSTRIP ‐1XROOFGASKET51‐5/8” –2XROOF GASKET 60”‐ 1XROOF T GASKET‐ 1XIncluded components:GLASS STORAGE & HANDLING! The solar panel glasswill arrive to the job site on a separate pallet from themetal components. Handling of the glass solar panel ispotentially hazardous and proper procedures shouldbe followed.L CHANNEL‐LONG ‐ 2XSOLAR PANEL ‐1XSOLAR WIRINGCONNECTOR ‐ 2X JUNCTION BOXCOVER ‐ 1X¼‐20 x 1‐1/4”SHCS ‐ 10XSOLAR PANELC‐SHAPEDGASKET ‐ 2XC CHANNEL ‐LONG‐ 2XC CHANNEL ‐SHORT‐ 2XL CHANNEL ‐SHORT‐ 2XSPACER BLOCK‐ 4X10‐24 x 5/8”SHCS ‐ 8XROOFGASKET48‐7/8” –2XRIGHT END ROOFPANEL – 1XP/N 61950LEFT END ROOFPANEL – 1XP/N 61951