10. PROGRAMMING EXAMPLESExample 1. Programming the meter to work with the flowmeter with reedrelay output of the following parameters:- pulse constant 1K - 4,3956 dm3/pulse = 0,0043956 m3/pulse;- minimal flow Qmin – 0,02 m 3/hThe parameters of input 1 should be set as follows:- tYP1 should be set to FreqL (frequency for (f<10kHz));The pulse constant for scaling should be given in m 3, but only fivesignificant digits can be set. When multiplying by a constant (SCAL setto AND), when rounded to five digits we get value 0.0044 (introducing tothe result of the calculation error of 0.1%). To reduce the error introdu-ced by the conversion, change the scaling by a constant dividing (SCALset to div) and as a constant value write the multiplicative inverse:ConS1= =227,5002275 ≈ 227,50When the inverse is rounded to five digits, the error introduced into thecalculations is of the size of 0.0001%.- SCAL1 should be set to dIv, ConS1 should be set to 227,50;- t_L1 and t_H1 should be set to a value 10 [ms] (due to the multiplicationof the pulse with a mechanical switch);- E-In1 – if no control inputs are used, should be set to bUt;To set the time, after which a zero flow will be indicated, the maximum timeinterval between pulses should be calculated for minimum flow Qmin.maximal time interval between pulses t_ max =t_ max =10,0043956pulse weight [m3] * 3600 [s]Qmin [m3]0,0043956 * 3600 [s]6