36 Installing the de-ashing system8.2 Installing the de-ashing systemWe recommend installing the de-ashing system after the Furnace has been brought in, but before the Furna-ce casing is fitted. The de-ashing system has to be installed before the burner casing is assembled.Installation of the de-ashing system is divided into the following steps:1. Bringing in and installing the de–ashing system on the base plate2. Installing the de-ashing auger, fitting the sub-assembly and mounting the door plate3. Installing the burner side casing with cut-out and electrical connection4. Assembling the pellet Furnace and activating the ash box88..22..11 BBrriinnggiinngg iinn aanndd iinnssttaalllliinngg ddee––aasshhiinngg ssyysstteemm oonn tthhee bbaassee ppllaatteeNote:5: Replace the screw with the base in a horizontal position.PE 603 USA_FA 1.0