Ó 2 0 0 3 - Ma gnum E nergy , I nc. 2 13 . I n s t a l l a t i o n , c o n t i n u e dW i r i n g t h e I n v e r t e r A C I n p u t ( r e f e r t o d i a g r a m s o n t h e f o l l o w i n g p a g e s )R em ove the cha s s is AC a cces s cov er to a cces s the interna l term ina l block .R oute the ca ble a nd conduit from the m a in pa nel, a pproved by pa s s s electors witch or m a in AC pa nel to the inverter ’s AC I NPUT conduit cla m p. T ightenthe cla m p s ecurely on the conduit. Alway s lea v e a little ex tra s la ck in the wiring.C onnect the hot wire ( B LAC K ) from the m a in pa nel’s dedica ted 3 0 a m p brea k er tothe “AC I NPUT ( HOT 1 I N) ” term ina l. T ighten the s crew term ina l to 1 6 inch- pounds .NOT E : I f us ing dua l inputs , connect the R E D wire from the m a in pa nel to AC I NPUT( HOT 2 I N)C onnect the neutra l ( W HI T E ) from the m a in pa nel’s neutra l bus ba r to the “ACI NPUT ( NE U) ” term ina l. T ighten the s crew term ina l to 1 6 inch- pounds .C onnect the ground ( G R E E N) wire from the m a in pa nel’s neutra l bus ba r to the“ G R OUND ” term ina l. T ighten the term ina l to 1 6 inch- pounds .W i r i n g t h e I n v e r t e r A C O u t p u t ( r e f e r t o d i a g r a m s o n t h e f o l l o w i n g p a g e s )R oute the ca ble a nd conduit from the AC dis tribution pa nel to the inverter ’s ACOUT PUT conduit cla m p. T ighten the cla m p s ecurely on the conduit.C onnect the hot ( B LAC K ) wire to the “AC OUT PUT 1 ( HOT ) ” term ina l. T ighten theterm ina l to 1 6 inch- pounds .NOT E : I f us ing dua l outputs , connect the R E D wire to the “AC OUT PUT 2 ( HOT ) ”term ina l.C onnect the neutra l ( W hite) wire to the “AC OUT PUT ( NE U) ” term ina l. T ighten theterm ina l to 1 6 inch- pounds .C onnect the ground ( G reen) wire to the “ G R OUND ” term ina l. T ighten the term i-na l to 1 6 inch- pounds .F i n a l I n s p e c t i o nVerify a ll ca bles / conduit runs a re s ecured with wire ties or other nonconductivefa s teners to prev ent cha fing or da m a ge from m ovem ent a nd v ibra tion.Verify s tra in reliefs or grom m ets a re in pla ce to prevent da m a ge to the wiring orconduit where it pa s s es through wa lls , bulk hea ds or other openings .Verify a ll AC connections a re correct a nd torqued to 1 6 inch pounds .R epla ce the cov ers on the m a in electrica l / dis tribution pa nel.R epla ce the cha s s is a cces s cov er.Verify the inv erter ’s front pa nel s witch is in the " OFF" pos ition.NOT E : I f required by code, hav e the ins ta lla tion ins pected by a n electrica l ins pector.2 . I N S T A L L A T I O N