199 Completing the Factory Installation1. Test the functionality of the original manufacturer’s boom controls. The NORAC ControlPanel (E01) does not need to be powered up for the original switches to function. Unfoldthe booms and raise/lower each boom and main section.Confirm that the cabling and hoses are agreeable to the entire range of motion.2. If any functions do not work, review the hydraulic and electrical portions of this manual tocheck for proper installation.3. Unfold the booms and level to 90 cm (or 35 inch) nozzle height. At this point ensure thesensors are reading from an adequate and uniform target, such as gravel or dirt, orconcrete.4. By using the “Quick Install” feature of the UC4.5 panel, the system may be configured inpreparation for the End-User. However, a hydraulic “ReTune” procedure will be requiredfor optimal performance. This is required to tune the UC4.5 hydraulic parameters to thoseof the End-User tractor hydraulic system.5. To perform the “Quick Install” procedure, select the FT1 sprayer type. Press and hold theswitch (for several seconds) until the word “SENSOR” appears on the UC4.5 controlpanel screen.6. The UC4.5 control panel will then prompt the installer to “EXIT CAB AND PUSH BOOMTIP DOWN TO GROUND”. When exiting the cab and approaching the boom, avoidwalking near the sensors as this may result in measurement error.7. At this point the UC4.5 panel should display the Main Operating Screen:M 90 M (example)8. This indicates the system is ready for the second stage of installation. This will be carried bythe end user (for the reasons as described previously in Step 4).