Color Change Tasks – Non‐Cyclone Side OperatorMove to the CycloneBlow off the lower section of the cyclone. Start at theflange and blow toward the bottom with a circularmotion.Blow off the bottom flange and interior of the cyclone.Swing the lower section of the cyclone down and latch itclosed.Swing the transfer pan down and latch it closed.Close the cleaning duct slide gate.O th b th d t th t d f th b th (ifOpen the booth doors at the entry end of the booth (ifnot already opened).Set all automatic guns to the auto mode.Start spraying new powder.If Spraying to WasteSpray until confident that all old powder is out of thesystem.Do not start production until the cyclone side operatorhas connected the reclaim hose to the sieve.ColorMax, Encore, HDLV, Nordson, and the Nordson logo areregistered trademarks of Nordson Corporation.AeroDeck is a trademark of Nordson Corporation.All other trademarks are the property of their respective owners.Nordson Corporation Amherst, Ohio USA4© Nordson Corporation 2013 All Rights ReservedTC-13-15Issued 7/13