System Setup3-6Part 1602221-01 2012 Nordson CorporationSystem Air SupplySupply air pressure should be 4.0−7.6 bar (58−110 psi). The air should besupplied from an air drop equipped with a self-relieving shutoff valve. Theair must be clean and dry. A refrigerant or desiccant-type air drier and airfilters are recommended.All systems are shipped with a 0.3-micron air filter. It is important that thefilter be used to prevent contamination of the system pneumaticcomponents and the powder supply.To provide air to your system, an input air kit with connectors, couplings,and 25 ft. of 10-mm air tubing is available. Refer to the Parts section forfilter kits, replacement elements, and input air kit part numbers and orderinginformation.Filter InstallationSee Figure 3-6.1. Use the mounting bracket (4) as a template to mark and drill mountingholes in the selected mounting surface. Make sure there is sufficientclearance to connect air tubing and change the filter element.2. Install the two male connectors (2) included in the kit in the filter inputand output ports.3. Install the mounting bracket on the filter, using the included M5 screws(3), on the side of the filter opposite the release latch (6).4. Mount the filter with customer-supplied fasteners (7).5. Note the orientation of the flow indicator (5) on the top of the filter. Use10-mm blue air tubing connect the air supply to the filter and the filter tothe controller.112234657FROM SUPPLYTO CONTROLLERFigure 3-6 Air Filter Installation − Wall and Rail Mount Systems1. 10-mm air tubing (blue)2. 10-mm tube x 1/2 male connectors3. M5 screws4. Bracket5. Flow indicator6. Release latch7. Customer-supplied fasteners