Encore HD Pump 21Part 1605708−01 2017 Nordson CorporationPump AssemblyCAUTION: Follow the assembly order and specifications shown. Pump damage may occur if youdo not carefully follow the assembly instructions.Procedure1. Place the customized O−ring (1) into the upperY block (2) as shown, then fasten the upper Yblock to the purge manifold housing (3) with theprovided hardware (4).1234Figure 19 Assemble Lower Y Block to Purge Manifold2. Assemble pinch valves (5), filter discs (6), andO−rings (7) into pinch valve housing (8). Referto Pinch Valve Replacement on Page 23 forassembly procedure.576 8Figure 20 Assemble the Pinch Valve Housing3. Assemble gasket (10) over lower Y block (11),then thread long screw and lock washer (12)through the lower y block and into the pinchvalve housing, upper Y block and purgemanifold. Hand tighten the screw.9121011Figure 21 Assemble Gasket and Lower Y Block4. Assemble the check valves (13) O−rings (12)access plugs (14), and fitting caps (10) togetherbefore replacing the fluidizing tubes (16). Then,once that is complete, assemble the completeaccess plugs (17) and additional O−rings ontothe fluidizing tubes (18)13171414151816Figure 22 Assemble Fittings to Fluidizing Tubes