Installation3‐2Part 7192568-03 2020 Nordson CorporationElectrical ConnectionsCaution: Equipment damage may occur if the electrical panel is connectedto any line voltage other than that stated on the identification plate.WARNING: Power to the Spectrum HD Generation II (SHD II) feed centermust be supplied from a locking disconnect switch or breaker. Failure toobserve this warning may result in a severe shock during installation orrepair.Make sure that all electrical cables are correctly rated and suitable for theambient temperature of the installation area. Provide adequate fuse/circuitprotection from the power supply. Refer to the foldout wiring diagrams andschematics at the end of this manual for more information.Before starting up the SHD II feed center, turn on the feed center power andrefer to the Setup procedure to program the controls for the application. Thisshould be performed only by a Nordson field engineer or technician.Pneumatic ConnectionsFor the connection size, location and volume required please refer to yourService Requirements drawing or contact your Nordson representative.Clean, dry, compressed air should be supplied from a refrigerated ordesiccant air dryer and filter/separators. Refer to Specifications in Section 2for compressed air specifications.NOTE: For information on the Pump Panel please refer to technical manualon Nordson emanuals website.