1611UDSBD-3GBEN, Pag. 17/36Warning : This appliance is equipped for a maximum gas supply pressureof 50 mbar.Warning : Pressure testing supply pipingTest pressures above 50mbar : Disconnect the heater and manual valve from thegas supply line which is to be tested. Cap or plug the supply line.Test pressures below 50mbar : Before testing, close the manual valve on theheater.10. Gas PipingandpressuresAll piping must be in accordance with requirements outlined in the National GasCodes (different for each country). Gas supply piping installation should alsoconform with good practice and any local codes. Support gas piping with pipehangers, metal strapping, or other suitable material. Do not rely on the heater tosupport the gas pipe.All sealing products shall be resistant to the action of liquefied petroleum gas orany other chemical constituents of the gas being supplied.Install a ground joint union and manual shutoff the gas cock upstream of the unitcontrol system.The unit is equipped with a nipple that extends outside the cabinet. Leak test allconnections by brushing on a leak detecting solution.WARNING: Allcomponents of agas supply systemmust be leak testedprior to plac-ing equipment inservice. NEVERTEST FOR LEAKSWITH AN OPENFLAME. Failure tocomply could resultin personal injury,property damage ordeath.Diameter gasconnectionFigure 7 : gas connectionTable 6 : diameter gas connectionWARNING :Do not over tightenand do not rotatethe gas valve insidethe heater controlcompartment.Type 015-3 through 030-3Nat. gas G20Propane G31 1/2