36 Ethernet Routing Switch 8310 and 8306 chassis installationPrerequisites• Provide adequate space around the unit for access to cableconnectors.• Ensure that the surface can safely support the weight of the chassis,its components, and its attached cables. See “Chassis installation timerequirements” (page 35).Procedure stepsStep Action1 Set the switch on the flat surface and check for properventilation.Allow at least 2 inches 5.1 cm) on each side for properventilation and 5 inches (12.7 cm) at the front for power cordclearance.2 Attach rubber feet to each marked location on the bottom of thechassis.The rubber feet are optional but recommended to keep the unitfrom slipping.3 Attach all devices to the ports.--End--Procedure job aid: Chassis weight including componentsThe following table shows the weight of each chassis including thecomponents.Chassis Maximum weight (chassis and components)8310 225 pounds (lb) (102 kilograms [kg])8306 140 lb (63 kg)Mounting the Ethernet Routing Switch 8310 and 8306 chassis inan equipment rackInstall the Ethernet Routing Switch 8310 and 8306 chassis in a standard19-inch equipment rack to provide a convenient location for the safeoperation of the switch.ATTENTIONIf you are mounting the chassis in a 23-inch equipment rack, see the rackmanufacturer’s 23-inch-to-19-inch rack adapter installation instructions.Nortel Ethernet Routing Switch 8300Installation — ChassisNN46200-309 01.01 Standard16 June 2008Copyright © 2008 Nortel Networks.