Instruction Manual ND IM 3 JAN 2017Instruction Manual IM ND 3 JAN 2017 Page 51.2 General Inspection & MountingWhen the unit is unpacked, make a visual inspection looking for missing parts or damage, whichmay have occurred during shipment. Some parts, such as hoses, and hose clamps may bepacked inside the hopper as well as the instruction manual. It is important that all electrical andpiping connections should be checked for tightness because vibration during transit may causethem to loosen.Inside of the hopper door, the (2) perforated air diffuser tubes (upper & lower) should bethoroughly cleaned to remove any dust, moisture or oil that may have accumulated duringshipment. The diffuser tubes must be reinstalled so they are properly aligned and secure. Theupper diffuser tube must be installed at the end of the vertical tube in the center of the hopper (it isa friction fit) and should stick out from the end of this tube as follows:NovaDrier UpperDiffuser TubeNovaDrier LowerDiffuser TubeOptional Short Run Diffuser Tube for usewhen hopper is less than 100% full.NOTE: NovaDriers should always berun with a 100% full hopper- neverbelow 75% full.