INSTALLATION INSTRUCTIONSREAD & SAVE THESE INSTRUCTIONS!Heat-LightCombination(with Night Light)MODEL: 9960FOR BEST RESULTSIn a new construction site, install the housing (completewith heater) during rough-in construction of the building. Thelight assembly and the grille should be installed when thefinished ceiling is in place.Installation in an existing, finished building requires anaccessible area (attic or crawl space) above the plannedlocation. See “INSTALLATION IN EXISTINGCONSTRUCTION.”Do not install closer than 12 inches to a vertical surface.Do not install over tub or shower enclosure.UNIT DIMENSIONSRefer to Figure 1 for housing's dimensions.NOTE: If there will be a finished second floor above,the Model 9960 housing requires a minimum of 2" x 8"joist construction for mounting.WIRING AND DUCTWORK1. Run the required wiring during rough-in stage ofconstruction.2. Total connected load: 1680 watts.3. Plan to run 120vAC, 60 Hz wiring (with ground) on aseparate 20 Amp circuit from a power source, throughthe provided wall switch, to the housing’s junction box.See wiring diagram.INSTALLATION INNEW CONSTRUCTIONPREPARATION1. Loosen hanger bar brackets to allow bars to be inserted.2. Refer to Figure 2. Insert hanger bars into brackets.3. Refer to Figure 3. Slide hanger bar brackets down to endof slot closest to outside edge of housing. Tighten bracketsin this position.4. Refer to Figure 4. Remove junction box cover byremoving one screw.5. Refer to Figure 4. Remove appropriate wiring knockout(s)and install approved box connector(s).FIGURE 1FIGURE 2FIGURE 3 FIGURE 47 3⁄4 "14"HANGER BARSADJUSTMENTSLOTJUNCTIONBOXCOVERKNOCKOUTS93⁄4 "