4INSTALLATION IN NEW CONSTRUCTIONOnce the locations for wall inlets have been determined, mountall inlet brackets.1. Choose the appropriate mounting bracket for the inlet beinginstalled. (See chart.)2. To locate bracket on wall stud, measure approximately 18" upfrom finished floor level. (Height may vary according toindividual preference.)MODEL 361 (FOR USE WITH 360 INLETS)3. Refer to Figure 7. Nail bracket to side of stud so that frontedge of bracket is flush to front of stud. (The bracket may alsobe nailed to the front edge of the stud. See face mountingillustrated. For face mounting, use locating tabs on bracket forproper alignment.)4. Refer to Figure 8. Remove cardboard from plaster guardframe. Using four (4) provided screws, attach the appropriateflanged fitting and inlet seal to back of inlet.5. Replace cardboard in plaster guard frame.MODEL 329 (FOR USE WITH 330 INLETS)6. When using Model 329, glue elbow to mounting plate. Attachto stud as shown in Figure 9.SIDEMOUNTING FACEMOUNTINGMODEL 3612 3/8" 1 13 /16"FIGURE 7FIGURE 8WALL INLET ROUGH-INSIDEMOUNTINGMTH2 3/8"MFIGURE 9NuTone Inlet Rough-in330 Series 329360 Series 361CI390 Series Electrified Inlet CI390RK