9InstallationNSF APPROVED SEALANTS:• Minnesota Mining #ECU800 Caulk.• Minnesota Mining #ECU2185 Caulk.• Minnesota Mining #ECU1055 Bead.• Minnesota Mining #ECU1202 Bead.• Armstrong Cork - Rubber Caulk.• Products Research Co #5000 Rubber Caulk.• GE Silicone Sealer.• Dow Corning Silicone Sealer.NOTE: Asphalt floors are very susceptible to chemical attack. A layer of tape on the floor prior to applying thesealant will protect the floor.OperationSTART UPPlug in the cooler and the compressor is ready to operate.• Temperature control set at #4 position gives the cooler an approximate temperature of 35°F. Allow unit tofunction several hours, completely cooling cabinet before changing the control setting.• Excessive tampering with the control could lead to service difficulties. Should it ever become necessary toreplace the temperature control it should be ordered from your dealer or recommended service agent.• Good air flow in your cooler is critical. Be careful to load product so that it neither presses against the backwall nor comes within four (4) inches of the evaporator housing. Refrigerated air off the coil must circulatedown the back wall.LIGHT SWITCH LOCATION:The switch is located on the front of the evaporator housing toward the right of the cabinet. Open the frontdoor.NOTE: If the unit is disconnected or shut off, wait five (5) minutes before re-starting unit.RECOMMENDATIONBefore loading product the unit should be run for 2 to 3 days. This allows confirmation that the electrical wiringand installation are correct and no shipping damage has occurred. Remember that the factory warranty doesnot cover product loss.