4211.2.4. EVACUATION OF THE EQUIPMENT(FOR EUROPE & OCEANIA DESTINATION)WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in thefollowing procedure.1. Connect a charging hose with a push pin to the Low and High side of a charging set and the service port of the 3-way valve.• Be sure to connect the end of the charging hose with the push pin to the service port.2. Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and vacuum pumpadaptor.3. Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 cmHg (0 MPa) to-76 cmHg (-0.1 MPa). Then evacuate the air approximately ten minutes.4. Close the valve of the charging set and turn off the vacuum pump. Make sure that the needle in the gauge does not moveafter approximately five minutes.Note: BE SURE TO TAKE THIS PROCEDURE IN ORDER TO AVOID REFRIGERANT GAS LEAKAGE.5. Disconnect the charging hose from the vacuum pump and from the service port of the 3-way valve.6. Tighten the service port caps of both of the 3-way valve at a torque of 18 N m with a torque wrench.7. Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN” using a hexagonalwrench (4 mm).8. Mount valve caps onto the 2-way valve and the 3-way valve.• Be sure to check for gas leakage.11.2.5. CONNECT THE CABLE TO THE OUTDOOR UNIT• If gauge needle does not move from 0 cmHg (0 MPa) to -76 cmHg (-0.1 MPa), in step above take the following measure:• If the leak stops when the piping connections are tightened further, continue working from step .• If the leak does not stop when the connections are retightened, repair the location of leak.• Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, it may cause frostbite.