• Inspection points for the Indoor Electronic Controller1. The Electronic Controller, a signal Receiver and anIndicator (Fig. 2) can be seen by the below steps:− Remove the 2 caps and 2 screws at the bottom ofthe front grille. (Fig. 1)− Remove the front grille by releasing the 2 hooks atthe top of the front grille. (Fig. 1)− Remove the control board cover by releasing the 2tabs at left, 1 tab on top and 2 more tabs at right sideof the control board cover. (Fig. 1)2. To remove the Electronic Controller, release the hookthat holding the electronic controller. (Fig. 2)• Indoor Fan Motor removal procedure:-1. Remove the control board by:-− Releasing CN-C (GRN) connector. (Fig. 2)− Releasing CN-FM (GRN) connector. (Fig. 2)− Releasing CN-STM connector. (Fig. 2)− Remove the earth wire screw. (Fig. 2)− Release the intake air sensor. (Fig. 2)− Release the piping sensor. (Fig. 2)− Unhook and release the terminal board. (Fig. 3)− Remove the right and left screws. (Fig. 3)− Then remove the control board by pressing down thehook at the left and press up the right hook. (Fig. 3)2. Remove the Fan Motor by:-− Release the Fan motor leadwire by pressing thehook at the center of the connector. (Fig. 4)− Then remove the particular piece that holding thefan motor by pressing the tab. (Fig. 4)− Remove the discharge grille and then the drainhose. (Fig. 4)Fig. 1Fig. 2Fig. 3Fig. 413 Servicing Information87CS-VA75KE CU-VA75KE / CS-VA95KE CU-VA95KE / CS-VA125KE CU-VA125KE