8Once the equipment has been moved to its final location remove the blanking plugs from both the inlet and outlet ports.Ensure that all piping materials are suitably rated for the application, clean and debris free. The diameter of the pipes must be sufficient to allowunrestricted inlet air supply to the equipment.Apply approximately 8 - 12 turns of P.T.F.E tape to the high quality stainless steel piping.Fit the piping along with the relevant pre and post filtration onto the inlet and outlet. Isolation valves must be installed after both the inlet andoutlet filtration.When routing pipes ensure that they are adequately supported to prevent damage or leaks in the system.All components used within the system must be rated to at least the maximum operating pressure of the equipment. It is recommended that thesystem is protected with suitably rated pressure relief valves.