6 7046-192C May 14, 20152700 I-ACCATTENTION INSTALLER:Follow this Standard Work ChecklistThis standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual.Customer:Date Installed:Lot/Address:Location of Fireplace:Installer:Dealer/ Distributor Phone #:Serial #:Model (circle one): 27I-ACCWARNING! Risk of Fire or Explosion! Failure to install fireplace according to these instructions can lead to a fire or explosion.Appliance InstallVerified clearances to combustibles. (Pg. 8)Fireplace is leveled and liner is secured to appliance. (Pg. 19)Hearth extension size/height decided.Outside air kit installed. (Pg. 18)Floor protection requirements have been met.The masonry chimney is inspected by a professional and is clean or thefactory built metal chimney is installed according to the manufacturer’sinstructions and clearances.Chimney Section 4 (Pg. 13)Chimney configuration complies with diagrams.Chimney installed, locked and secured in place with proper clearance.Chimney meets the minimum height requirements.Roof flashing installed and sealed.Terminations installed and sealed.Clearances Section 3 (Pg. 7)Combustible materials not installed in non-combustible areas.Verified all clearances meet installation manual requirements.Mantels and wall projections comply with installation manual requirements.Protective hearth strips and hearth extension installed per manual requirements.Appliance Setup Section 5 (Pg. 18)All packaging and protective materials removed.Firebrick, baffle and ceramic blanket installed correctly.All labels have been removed from the door.All packaging materials are removed from inside/under the fireplace.Manual bag and all of its contents are removed from inside/under the fireplaceand given to the party responsible for use and operation.Hearth & Home Technologies recommends the following:• Photographing the installation and copying this checklist for your file.• That this checklist remain visible at all times on the fireplace until the installation is complete.Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:Comments communicated to party responsible by on(Builder/Gen. Contractor) (Installer) (Date)Part # 4017-254 • Rev B • 01/29/13YES IF NO, WHY?F. Install Checklist