August 13, 2018 7063-513I 7VOYAGEUR Insert ACCF. Install Checklist ATTENTION INSTALLER:Follow this Standard Work ChecklistThis standard work checklist is to be used by the installer in conjuction with, not istead of, the instructions contained in this installation manual.Customer:Date Installe:Lot / Address:Location of Appliance:Installer:Dealer / Distributor Phone #:Serial #:Model:WARNING! Risk of Fire or Exposion! Failure to install appliance according to these instruction can lead to a fire or explosion.Appliance InstallVerified clearances to combustibles.Appliance is leveled and connector is secured to appliance.Hearth extension size/height decided.Outside air kit installed.Floor protection requirements have been met.If appliance is connected to a masonry chimney, it should be cleaned andinspected by a professional. If installed to a factory built metal chimney, thechimney must be installed according to the manufacturer’s instructions andclearances.ChimneyChimney configuration complies with diagrams.Chimney installed, locked and secured in place with proper clearance.Chimney meets recommended height requirements (14-16 feet).Roof flashing installed and sealed.Terminations installed and sealed.ClearancesCombustible materials not installed in non-combustible areas.Verified all clearances meet installation manual requirements.Mantels and wall projections comply with installation manual requirements.Protective hearth strips and hearth extension installed per manual requirements.Appliance SetupAll packaging and protective materials removed.Firebrick, baffle and ceramic blanket installed correctly.All labels have been removed from the door.All packaging materials are removed from inside/under the appliance.Manual bag and all of its contents are removed from inside/under the applianceand given to the party responsible for use and operation.Hearth & Home Technologies recommends the following:• Photographing the installation and copying this checklist for your file.• That this checklist remain visible at all times on the appliance until the installtion is complete.Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:Comments communicated to party responsible ____________________________ by _____________________ on ___________(Builder / Gen. Contractor) (Installer) (Date)__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________YES IF NO, WHY?________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________