Chapter 4: Commissioning the system 37Chapter 4: Commissioning the system4.1 IntroductionThis chapter details the commissioning of your E-Series Display and includes thefollowing:• Required input.• Pre-start checks.• Initial power on procedure• Radar checks and alignment.• Chart application checks.• Fishfinder checks.• SeaTalk High Speed checks.• Video in/out.• AIS.• Weather.• Navtex.4.2 Pre-start checksBefore you perform any functional tests, please carry out the following pre-startchecks:Radar• Check that the scanner has been installed in accordance with the instructions con-tained in the relevant handbook. All securing bolts should be fully tightened andany mechanical locking arrangements, as specified, are in place.• Ensure scanner and power connections have been made.• If an open array is fitted, ensure that power is connected through a split cable to asuitable circuit breaker and that the power switch located on the pedestal is set toON.• All connecting wires are secured and protected as necessary.Note:If you are the boat’s owner and have installed the radar system, ask an authorized Ray-marine dealer to check the installation before going to sea.WARNING:Electromagnetic energyThe radar scanner transmits electromagnetic energy. Ensurethat the scanner has been installed according to therecommendations in the relevant scanner handbook. Ensure allpersonnel are clear of the scanner, before switching totransmit mode.