8EN AssemblyAttaching the ground spreader SP 751. Place the ground spreader on the floor and open out the legs.Place the spikes of the tripod between the foot moulding on theground spreader.2. Push down firmly on the leg, put your fingers through the largerloop, and pull the rubber pull-loop over the latching nose.Setting up the mid-level spreader 75 HD1. Pull up the ring in the centre of the spreader. Adjust the profilesetting to either HIGH (45°) or LOW (flat) and arrest the tripod legsin position.