8Installation ProcedureEnglishInstallation Procedure• Make sure that the wall can support the weights ofthe rack and the outdoor unit.• Install the rack close to the column as much aspossible.Optional: Fixing the outdoor unit to a wall witha rackSoft rubber designed to cut off vibration fromrack to wall. (not supplied with product)Designed to cut off residual vibration fromoutdoor unit to rack. (not supplied with product)Anchor boltBase surface20 mm• Install a proper grommet in order to reduce noise andresidual vibration transferred by the outdoor unittowards the wall.CAUTION• When installing an air guide duct, be sure to checkthe following:– The screws do not damage the copper pipe.– The air guide duct is fixed firmly on the guard fan.Step 3 Connecting the power cables,communication cable, and controllersYou must connect the following three electrical cables tothe outdoor unit:• The main power cable between the auxiliary circuitbreaker and the outdoor unit.• The outdoor-to-indoor power cable between theoutdoor unit and the indoor unit.• The communication cable between the outdoor unitand the indoor unit.CAUTION• During installation, make first the refrigerantconnections and then the electrical connections. Ifthe unit is uninstalled, first disconnect the electricalcables and then the refrigerant connections.• Connect the air conditioner to the earthing systembefore making the electrical connections.NOTE• Especially, if your outdoor unit is the one designedfor Russian and European markets, consult the supplyauthority, if necessary, to estimate and reduce thesupply system impedance before installation.Air conditioning system examplesWhen using earth leakage circuit breaker (ELCB) for asingle phaseMCCBELCBELBMain powercableCommunication cableOutdoor-to-indoor power cableEarthingOutdoor UnitORIndoor Unit