23ENGLISHWiring workSilver solderNorminaldimensionsfor cable(mm2)Norminaldimensionsfor screw(mm)B D d1 E F L d2 tStandarddimension(mm)Allowance(mm)Standarddimension(mm)Allowance(mm)Standarddimension(mm)Allowance(mm) Min. Min. Max.Standarddimension(mm)Allowance(mm) Min.1.5 4 6.6 ±0.2 3.4 +0.3-0.2 1.7 ±0.2 4.1 6 16 4.3 +0.20 0.74 82.5 4 6.6 ±0.2 4.2 +0.3-0.2 2.3 ±0.2 6 6 17.5 4.3 +0.20 0.84 8.54 4 9.5 ±0.2 5.6 +0.3-0.2 3.4 ±0.2 6 5 20 4.3 +0.20 0.9N LN L N L N LELCBMCCB+ELBV1 V2Indoor Unit 1 Indoor Unit 2 Indoor Unit 3Indoor Unit 4 Indoor Unit 5 Indoor Unit 6Outdoor UnitWired RemoteControlEEV kith Ceiling, wall-mounted indoor unit.220-240V~orh ELCB : Essential InstallationWARNING :Power off before connecting any wires;Indoor PBA will be damaged while V1,V2,F3,F4 short eachother.Power and communication cable connectionSelecting compressed ring terminal1. Before wiring work, you must turn off all power source.2. Indoor unit power should be supplied through the breaker( ELCB or MCCB+ELB ) separated by theoutdoor power.ELCB:Earth Leakage Circuit BreakerMCCB:Molded Case Circuit BreakerELB:Earth Leakage Breaker3. The power cable should be used only copper wires.4. Connect the power cable{1(L), 2(N)} among the units within maximum length and communicationcable(F1, F2) each.5. Connect F3, F4(for communication) when installing the wired remote control.