E-9ENGLISHOutdoor unit installationThe outdoor unit must be installed on a rigid and stable base to avoid any increase in the noise leveland vibration, particularly if the outdoor unit is to be installed in a location exposed to strong winds orat a height, the unit must be fixed to an appropriate support(wall or ground).Fix the outdoor unit with anchor bolts.Note The anchor bolt must be 20mm or higher from the base surface.Make a drain outlet around the base for outdoor unit drainage.If the outdoor unit is installed on the roof, you have to checkthe ceiling strength and waterproof the unit.CAUTIONOutdoor Unit Support����Anchor boltOutdoorUnitBase SurfaceOutdoor UnitSupportOUTDOOR UNIT INSTALLED ON THE WALL BY RACK- Ensure the wall will be able to suspend the weight of rack and outdoor unit;- Install the rack close to the column as much as possible;- Install proper grommet in order to reduce noise and residual vibration trans-ferred by outdoor unit towards wall. Soft rubber designed to cutoff vibration from rack to wall.(not supplied with product)Designed to cut offresidual vibration fromoutdoor unit to rack. (notsupplied with product)Unit : mm690930373403427Anchor bolt hole���������������Anchor bolt holeType A Type B