Instructions for Use, Installation and Servicing ecoMAX pro 135.10 Water TreatmentFor optimum performance the boiler and its associatedcentral heating system should be flushed in accordancewith BS7593: 1992 using a cleanser.For advice on the application of system cleansers andinhibitors contact either;Fernox, Alpha-Fry TechnologiesTandem HouseMarlow WayBeddington Farm RoadCroydon CR0 4XSTel: 0870 601 5000Fernox technical help line01799 550811or:Sentinel, GE BetzWidnesCheshire, WA8 8UDTel: 0151 420 95956 Boiler location and ventilation6.1 Boiler LocationThe boiler may be installed in any room althoughparticular attention is drawn to the requirements ofthe current issue of BS7671, IEE Wiring Regulations,the electrical provisions of the Building Regulations(Scotland), and in IE the current edition of IS 813 andthe ETCI rules, with respect to the installation of a boilerin a room containing a bath or a shower. Any electricalswitch or boiler control using mains electricity should beso situated that a person using the bath or shower cannottouch it.The boiler must be mounted on a flat wall, which issufficiently robust to take its total weight. The boilermay be installed on a combustible wall, subject to therequirements of the Local Authorities and BuildingRegulations.The boiler is not suitable for fitting outdoors.6.2 ClearancesThe boiler should be positioned so that at least theminimum operational and servicing clearances areprovided, see Fig. 6.1.Additional clearances may be beneficial around theboiler for installation and servicing.For flue installations where external access is notpracticable, consideration should be given for the spacerequired to insert the flue internally, which maynecessitate clearance larger than those specified inFig. 6.1.6.3 Timber Frame BuildingsIf the boiler is to be installed in a timber frame building itshould be fitted in accordance with the Institute of GasEngineers document IGE/UP/7/1998.6.4 Room VentilationThe boiler is room sealed, so when it is installed in aroom or space, a permanent air vent is not required.6.5 Compartment VentilationIf the boiler is installed in a compartment, a permanentair vent is not required.Leave existing air vents.Fig 6.1126295 Water system 6 Boiler location and ventilation