TLS Magnetostrictive Probes International Installation Guide Field Wiring22Figure 21. Removing Sealing Compound Clip7. Thoroughly mix compound together. Invert bag several times while squeezing compound from one end to theother for a minimum of one minute.8. Once the mixture feels warm, immediately cut one corner and slowly fill the plastic sleeve. Stop just short offilling the entire sleeve. Do not overfill. [Figure 22]Figure 22. Pouring Sealing Compound Into Sleeve9. With a twisting motion, rotate the outer clear plastic barrel to close the pouring slot.10. Wait at least five minutes, then use the large cable tie to mount the splice to the riser pipe or probe canister asapplicable (see Figure 23).