112. Delivery and installationThe drilling and milling machines are carefully packed in our factory.Please check the following upon receipt of delivery:1. Whether the packaging has been damaged and/or:2. Whether the drilling and milling machine shows signs of transport damage or if thereare reasons for complaints. In this case we request your immediate notification. Claimsmade at a later date cannot be considered.The drilling and milling machine must be installed on an appropriate, level and firm base.This would be, for example: a base cabinet such as in our accessories’ programme an own work bench as long as it is strong enough to carry the weight of the machine withoutwarping (see technical data and check with spirit level) and has an even surface a steel plateThe drilling and milling machine must be firmly screwed down onto the base. To facilitate this, thereare 10 mm holes in the machine base. Good results and a minimum of vibration duringoperation can only be guaranteed if the above mentioned requirements for secure mountinghave been adhered to.The installation of the machine should take place where there is sufficient lighting, electrical cableswith earthed sockets and 0-conductors are installed adequately near to the machine so that themains connection lead is not subject to any tension whatsoever. The mains lead should be suchthat, by means of a multiple socket, a coolant or lubrication unit can also be connected.