37VERSION 05/2019 ORDER NUMBER DOC2326960 PEM-X1 CG8.2.2 MAINTENANCE INSTRUCTIONSDANGERIncorrect maintenance/repair!Danger to life and equipment damage.Only a WAGNER service center or a suitably trained person may carry out repairs andreplace parts.Only repair and replace parts that are listed in the "Spare parts" chapter and that areassigned to the unit.Before all work on the device and in the event of work interruptions:– Switch off the energy and compressed air supply.– Relieve spray gun and device pressure.– Secure the spray gun against actuation.Observe the operating and service manual for all work.Prior to maintenance– Flush and clean the system. Chapter 8.1.2After maintenance– Carry out safety checks in accordance with Chapter 8.2.3.– Put the system into operation and check for leaks.– Have the system checked for safe condition by a skilled person.8.2.3 SAFETY CHECKS AND MAINTENANCE INTERVALSDaily: Before starting work, carry out a visual inspection to ensure that the system is grounded.8.2.4 MAINTENANCE PROCEDURESThe maintenance intervals should be adapted by the operator depending on the level ofuse and if necessary the level of soiling.If in doubt, we recommend contacting WAGNER's specialist personnel.Maintenance work Time stamponce each shift weeklyBlow out gun and check for sinteringCheck gun settingsCheck gun discharge pressureBlow out powder hosesCheck groundingCheck compressed air qualityCheck gun voltageCheck powder hoses for bends and sintering