RCE OperationOperator’s manual 277 Operation7.1 Prior to starting the machineAfter unpacking, the machine is ready for operation.PlugThe machine comes with a country-specific plug as a standard equipment.Carrying out checksf Check if mains or power distribution on the construction site have the correctoperating voltage (see nameplate of the machine or chapter Technical Data).f Check if mains or power distribution on the constructions site are protectedin accordance with current standards and regulations.WARNINGImproper handling can result in injury or serious material damage.f Read and follow all safety instructions of this operator's manual, see chapterSafety information.WARNINGMovable knives.Body parts could be cut off.f Do not touch the cutting head when the motor is running.f Close protective hood (if there is one).