Waterous Arizona Operations 500-100 & 120-P Operations Rev 1Page 15 of 30NOTE: With 1-3/4” hose lengths of 100’-250’ (30.48 – 76.2 meters), up to 90-120 GPM (340.68 –454.24 LPM) of water and 40-100 CFM (1.12 – 2.8 m3/min)of air may be utilized as ahighly effective initial attack flow.System flows are very flexible. The flow of any discharge can vary according to the situationand conditions.It is possible to make the discharge stream wetter or drier by changing the amount of solutionor air in the hose.The stream can also vary by changing the tip size at the nozzle. The bigger the diameter tip, the drier the foam. The smaller the diameter tip, the wetter the foam.D. Master Stream1” Tip Solution Flow:90-120 GPM (340.68 – 454.24 LPM)Air Flow: 60-80 CFM (1.68 – 2.24 m3/min)1-3/8” Tip Solution Flow:100-150 GPM (378.53 – 567.80 LPM)Air Flow: 70-100 CFM (1.96 – 2.8 m3/min)1-1/2” Tip Solution Flow:120-200 GPM (454.24 – 757.06 LPM)Air Flow: 80-120 CFM (1.68 – 3.36 m3/min)1-3/4” Tip Solution Flow:180-250 GPM (681.35 – 946.33 LPM)Air Flow: 120-150 CFM (3.36 – 4.2 m3/min)2” Tip Solution Flow:250-450 GPM (946.33 – 1703.39 LPM)Air Flow: 200 CFM (5.6 m3/min)Disch. Pressure: 120-150 PSI (8.1648 – 10.206 BAR) (827.4 – 1034.25 KPA)