PREINSTALLATIONTable 1-21. Hardware requirementsSystem RequirementsVMS/UNIBUS • Supported VAX series hardware configuration (CPU,memory, peripherals) with UNIBUS I/O subsystem• DMR11-M synchronous interface and cabinet kit.VMS/VAXBI • Supported VAXBI series hardware configuration (CPU,memory, peripherals)• DSB32-AA synchronous interface and cabinet kit.VMS/Q-bus • Supported MicroVAX hardware configuration (CPU,memory, peripherals)• DSV11 Q-bus synchronous interface and cabinet kit.Software requirementsThe VAX-resident print supervisor (symbiont) software requiresthe following supported software:• VMS Version 5.0 (or later)• VAX Wide Area Device driver.DocumentationA number of reference manuals are available to assist you inmaximizing the productivity of your LPS. The reference set foryour LPS is delivered with the equipment at installation. All ofthe manuals may be ordered as a set or individually.References Refer to the “Ordering documentation and software” section ofthe “Postinstallation” chapter for procedures on how to orderadditional documentation and the Xerox CustomerDocumentation Catalog.TrainingThis section describes the training available through Xerox.Operator training Operator training is conducted at your location shortly after yourLPS is installed. Training takes approximately four to sevenhours, depending on the system configuration, and includeshands-on practice running basic jobs, maintenance, and problemsolving. Determine the number of operators you want to attendthe initial training, and schedule training dates and costs throughyour sales representative and system analyst.Advanced Customer Training (ACT) is available at the Xeroxtraining center in Leesburg, Virginia. Discuss candidates for thistraining with your sales representative, if desired. Keep in mindthat operators should not be considered for ACT until they have1-26 XEROX 4050/4090/4450/4650 LPS INSTALLATION PLANNING